Introduction

Dear reader,

You’re now on the subscription page of the tender for DanTysk and Sandbank Offshore Windfarm Cable Protection Systems Stabilization Works. On this page you can subscribe for the tender. For this tender the documents are not published on this page. The documents will be available after subscribing for the tender.

At the DanTysk site the Employer has concluded that 40 x WTG CPS ends and 8 x OSS CPS ends require an Employer design loose rock berm installed. At the Sandbank site the Employer has concluded that 8 x OSS CPS ends require an Employer design loose rock berm installed. The loose rock berm design will render the CPS static and therefore reduce abrasion, general wear and tear and future maintenance works. The execution can be carried out in a single campaign or in several.

If interested, you can subsribe to the tender at the section ‘Subscribe’.

Best regards,
Thorben Wehleit
Vattenfall

Contact

Vattenfall

Contact:

Thorben Wehleit

Need Help?

Documents

The documents below provide information enabling you to decide whether you would like to register for this request. Click on the document name to view its content.

Document
Invitation

State

Evaluation
14 Jun 2024 07:00
29 Jul 2024 11:00